Public Works
South Maitland River Drain - Jermyn Crossing |
- South Maitland River Drain - Jermyn Crossing Report prepared by Spriet Associates - South Maitland River Drain - Jermyn Crossing Plan and Profile |
088013 Culvert Replacement (Line 88) |
Starting September 5, 2023 to late November there will be no through traffic due to a culvert replacement. ![]() ![]() ![]() ![]() Formwork for the footings ![]() ![]() |
Louise Avenue N Reconstruction (Binning St. to Rogers Rd.) |
Project Details: Starts the week of July 3rd and is expected to continue to the end of August. Hanna and Hanna Construction will be conducting the work, the inspection and engineering is being provided by Triton Engineering. |
Elma Avenue W Reconstruction (Wallace Ave. S. to Victoria Ave. S.) |
Project Details: Starts the week of June 19th and is expected to be completed by the 1st week of October. Kurtis Smith Construction will be conducting the work, the inspection and engineering is provided by GM Blueplan. |
Elm Avenue N Reconstruction (Elizabeth St. E to Main St.) |
Project Details: Starts tentatively the week of July 17th and is expected to be completed by the 2nd week of October. Moorefield Construction will be conducting the work, the inspection and engineering is being provided by Triton Engineering. |
North East Developing Lands - Phase 1 |
Project Details
March 2023 November 2022 Excavation work for the stormwater management pond
|
Asphalt Resurfacing Program |
Project Details*All dates are to be confirmed and will be updated on the site once Contractors have finalized their schedules. Road Construction
Pavement Preservation
Line 89 Reconstruction:Paving is scheduled to begin the week of September 19, 2022.
Line 81 Paving Operations:Line 88 Paving Operations: |
Transportation Master Plan and Truck Route |
North Perth has been developing a long-term strategy to strengthen and support the transportation network within the community. The North Perth Transportation Master Plan (NPTMP) will provide a vision and policy framework for a complete transportation system that will meet travel demands to 2041 in a manner that is sustainable and compatible with future growth. The study will identify the Road Network Hierarchy, assess future needs including truck routing and active transportation corridors as well as recommend needed policy and comment on the phasing and costs of recommended solutions. The study will follow the requirements of the Municipal Class Environmental Assessment (an approved process under the Ontario Environmental Assessment Act) and align with the Municipality’s Corporate Strategic Plan, land use plans, and other policies. The need for a Truck Route was identified through the NPTMP and is now a separated project where the evaluation of alternatives and a recommendation on a preferred option is now part of this project.
Presentation Information:One Way Block - Main & Wallace Intersection
|
Servicing Master Plan Project |
The Municipality of North Perth is undertaking a Servicing Master Plan for stormwater, wastewater and water servicing in the communities of Listowel and Atwood. The Master Plan was initiated in late 2021, investigation and surveying of assets is continuing in the data gathering phase. Existing and future needs for infrastructure as the two communities will be understood through the project that is expected for completion in 2023. Upon completion, the Master Plan will serve as a strategic document, and identify infrastructure upgrades or expansions to support continued growth and address existing deficiencies.
The Master Plan Process The Servicing Master Plan is being conducted in accordance with the requirements of the Municipal Class Environmental Assessment (Class EA) document, dated October 2000, as amended in 2007, 2011 and 2015 under the Environmental Assessment Act. Master Plan studies incorporate Phases 1 & 2 of the Class EA process (identification of the problem or opportunity, and evaluation of alternative solutions) and also includes consultation with the general public, community stakeholders, government review agencies and Indigenous communities. The process has just been initiated. There will be additional opportunities for public comment and input as the process moves forward.
Public Involvement Public consultation is a key component of this study. Initial comments are welcome at this time. As a part of the consultation component of this project, a public information meeting will be held during the course of the study. Details regarding the public meeting will be provided in a future notice. Any comments collected will be maintained on file for use during the project and may be included in project documentation. With the exception of personal information, all comments will become part of the public records. For further information on this project, please contact the consulting engineers: B.M. Ross and Associates Ltd., 62 North Street, Goderich Ontario, N7A 2T4 (519) 524-2641 Attention: Kelly Vader, Environmental Planner, Email: kvader@bmross.net. For information from the municipality contact Lyndon Kowch, Manager of Operations at lkowch@northperth.ca. |
Boulevard Tree Maintenance |
|
Facilities
Listowel Memorial Arena Demolition and Redevelopment |
Project Details
|
Elma Logan and Wallace Arena Lighting |
Project Details
|
Removal of the Memorial Dam in Listowel |
The Memorial Dam Removal project is almost complete. The dam has been removed. The silt fence will remain until October and the snow fence will remain until grass seed has taken. Once the water recedes in the fall the final rebar will be removed. During construction the pedestrian bridge will be closed to the public daily from 7am to 6pm. Access to the site is restricted to authorized personnel. |
Environmental Services
Wastewater Treatment Plant Upgrades |
Project Details
PhotosHeadworks Building Grit and Grease Removal System
Automatic Bar Screen Transformer Replacement Emergency Power Generator UV System Biosolids Digester Administration Building Addition Driveway Entrance |
Library and Child Care
Monkton Family Child Care/EarlyON Centre and Library Branch Relocation |
Project Details
PhotosView this presentation for a collection of project progress photos. |